Bristol, CT
Gray Wolf Data Centers – Bristol
Gray Wolf Data Centers · Permitting · 234 Riverside Ave
Former Dodge Village site on the Pequabuck River. CT Siting Council approved fuel-cell power (Petition 1540) in Dec 2022; a construction-time extension was approved Sept 2025; the Inland Wetlands Watercourses Agency approved the wetlands permit in April 2026 with stormwater conditions. Active local opposition over water usage — the operator has published its own water-use comparison.
Lifecycle timeline
ObservedConfirmed events only, with sources. Timing and observation, not cause and effect.
No milestones recorded yet.
Estimated water use
EstimateNo published facility capacity (MW) is available yet, so no estimate can be produced. This is intentional — the estimate is only shown when it can be backed by a published figure.
Observed hydrologic data
ObservedFrom nearby USGS and NOAA monitoring stations, refreshed monthly. Dashed lines mark lifecycle milestones — timing only, not causation.
Groundwater level (ft below surface)
USGS CT-BU 2 (414615072581601)
Groundwater level (ft below surface)
USGS CT-S 375 (413724072551101)